Specifications include, but are not limited to: Project consists of the demolition of a two-story building, and the construction of a single story fire station and a separate joint use building. Site improvements consist of existing paving demolition and new concrete paving drives and parking area, limited curb and gutter reconstruction, new site utilities, off-site utility tie-ins and street work, and lawn areas. Building construction consists of tilt-up concrete wall panels, steel framed roof system, drilled pier and suspended floor system, storefront openings, drywall partitions, flooring, suspended ceiling systems, hollow metal and plastic laminate doors, millwork, and HVAC, plumbing, fire sprinkler and electrical systems, in accordance with the plans, specifications and contract documents.