Specifications include, but are not limited to: The Project consists of the demolition and replacement of two (2) existing above ceiling direct expansion air handling and condensing units and controls, duct modifications to resolve existing comfort control issues and assist in airside balancing, relocation of two (2) existing thermostats, installation of three (3) inline exhaust fans, the demolition of a single existing rooftop fan, complete airside balance of entire building, including outdoor air balance to insure positive building pressurization, and waterside balance of existing chilled/hot water loops. Also included is the provision and installation of controls necessary to integrate existing chilled/hot water air handling unit, control temperature in lab, humidity in lab, and differential pressure between lab and adjacent spaces via introduction of conditioned outdoor air and all associated demolition, mechanical, and electrical work associated with entire scope outlined above.