Specifications include, but are not limited to: The demolition and renovation scope will be approximately 3,298 GSF of the existing space inthe Biomedical Research Building (NL) for the Cell Biology department.This space will require the demo and removal including but not limited, selective demolition,walls, acoustical ceilings, fire sprinklers, fire alarm devices, ductwork, HVAC equipment,smoke detectors and lighting as shown on the drawings.The space will require new construction of interior metal fabrications, rough carpentry,penetration firestopping, joint sealants, hollow metal doors and frames, flush wood doors,door hardware, glazing, drywall, acoustical ceilings, resilient floor and base, carpeting, dryerase wall covering, acoustical blanket insulation, painting, laboratory service sittings,roller window shades, lab casework, fire protection systems, MEP systems, addressable firealarm systems, testing, commissioning, coordination of equipment requirements withvendors as shown on the drawings