Specifications include, but are not limited to: The demolition and renovation scope will be approximately 553 GSF of the existing space in theBiomedical Research Building (NL) for the Cell Biology department.This space will require the demo and removal including but not limited, selective demolition,walls, acoustical ceilings, fire sprinklers, fire alarm devices, ductwork, HVAC equipment,smoke detectors and lighting as shown on the drawings.The space will require new construction of rough carpentry, penetration firestopping, jointsealants, resilient flooring & base, drywall, painting, acoustical ceilings, lab casework, fireprotection systems, MEP systems, addressable fire alarm systems, testing, commissioning,coordination of equipment requirements with vendors as shown on the drawings.Contractor (GC) to furnish all of the labor, the materials, the tools, the equipment, the servicesand the supervision required to complete the demolition and renovation scopes of work per theContract Documents dated December 5, 2012