Specifications include, but are not limited to: 1.00 LS CLEARING AND GRUBBING 724.00 CY CHANNEL EXCAVATION 4.00 CY TEST HOLE 193.00 CY BORROW, TYPE C 22.00 CY GRADED AGGREGATE BASE COURSE, TYPE B 47.00 TON DELAWARE NO. 57 STONE 18.00 TON BIT CONC SP TY C 115 GYR PG 64-22 (CARBO 1.00 EACH MODIFIED USBR TYPE V IMPACT BASIN 1.00 LS REMOVE AND RESET PEDESTRIAN BRIDGE 1.00 LS TEMPORARY TIMBER MAT 7.00 TON RIPRAP, R-5 70.00 TON RIPRAP, R-7 122.00 CY FURNISHED CASCADE MATERIAL 422.00 TON IMBRICATED ROCK STRUCTURES 25.00 CY SALVAGED CHANNEL BED SAND AND GRAVEL 19.00 CY FURNISHED CHANNEL BED SAND AND GRAVEL 371.00 SY GEOTEXTILES, SEPARATION 95.00 SY GEOTEXTILES, RIPRAP 2.00 EACH BOLLARD 247.00 LF CHAIN LINK FENCE 1,862.00 LF TEMPORARY CONSTRUCTION FENCE 38.00 LF SAW CUTTING, BITUMINOUS CONCRETE 1.00 LS INITIAL EXPENSE/DE-MOBILIZATION 1.00 LS CONSTRUCTION ENGINEERING 4.30 EAMO FIELD OFFICE, SPECIAL I 1.00 LS MAINTENANCE OF TRAFFIC 170.00 EADY TEMPORARY WARNING SIGNS AND PLAQUES 50.00 LFDY TEMPORARY BARRICADES, TYPE III 565.00 LF SILT FENCE 1.00 EACH DEWATERING BAG 3,650.00 SY TOPSOIL, 4" DEPTH 2,542.00 SY PERMANENT GRASS SEEDING, DRY GROUND 720.00 SY PERMANENT GRASS SEEDING, WET GROUND 38.00 TON STABILIZED CONSTRUCTION ENTRANCE 995.00 SY MULCH ACCESS ROAD 821.00 SY COIR FIBER MATTING 695.00 SY COIR BLANKET 383.00 SY STREAM RESTORATION SEEDING 1.00 LS STREAM DIVERSION 1.00 LS PLANTINGS 416.00 EACH PLANTINGS, TUBELINGS