Specifications include, but are not limited to: FURNISH ALL TOOLS, EQUIPMENT, MATERIALS, LABOR AND 1 LOT SUPERVISION REQUIRED TO PROVIDE THE FOLLOWING SERVICES AT THE FOLLOWING LOCATION. DESCRIPTION OF WORK A. REPLACE THE EXISTING BAS SYSTEM ACCORDING TO THIS SOW. B. INTEGRATE THE NEW BAS CONTROLLERS WITH EITHER THE CAMPUS AND OVER CONTINUUM OR SIEMENS APOGEE FRONT END SYSTEM THAT MEETS THE LATEST PUBLISHED UT DDC CONTROLS SPECIFICATION. C. DESIGN THE NEW BAS TO BE ROBUST. THIS NORMALLY MEANS A SEPARATE CONTROLLER FOR EACH MAJOR GROUP OF HVAC EQUIPMENT PROVIDING RELIABLE CONTROL EVEN IF NETWORK COMMUNICATION OR OTHER CONTROLLER(S) FAIL. DISCUSS WITH THE PM. D. PRE-BUILD AND TEST BAS FRONT END SCREENS, FIELD PANELS, CONTROL DEVICES, AND WIRING SUCH THAT POINT TRANSFER TIME BETWEEN OLD AND NEW CONTROLLERS IS MINIMAL, ESPECIALLY FOR CARS POINTS.