Specifications include, but are not limited to: Demolition 1. Remove the carpet in the area of the proposed classroom. 2. Demo 1 HVAC diffuser and 1 return air duct. 3. Demo any misc. items required to make a complete installation. 4. Spot demo ceiling grid at locations to allow for patrician wall construction. Drywall 1. Build room patrician walls and storage room walls 12 above the ceiling. 2. Walls to be fully insulated. 3. All walls to be tape bed and textured to match construction in the area. Doors and Hardware 1. Doors to be HM frames and door type to match doors in the area. 2. Hardware is to match existing hardware in the area with closures on two classroom doors. 3. Locks to match BEST 8 pin core. Ceiling 1. The existing ceiling grid is to be modified to accept 2 X 2 ceiling tiles in the new classroom only. 2. Re-use the existing ceiling insulation. Add insulation if needed to insure 100% coverage. 3. Ceiling tile in the new classroom to be Armstrong 556 Cirrus 2 X 2 X 7/8 angled or beveled tegular edge, or approved equal. 4. Grid to be reworked as required for new ceiling tile and light layout. Paint 1. Apply two coats of wall Val Spar premium paint to match existing quality. Color to be selected by owner from standard colors. Door finish to match existing doors in the area. Carpet 1. Demo existing carpet in the area of the proposed room and prep floor for new carpet. 2. Carpet is to be glue down carpet tile, Interface, Cubic from standard color selection or approved equal. 3. Provide 10% shelf stock. 4. Provide covers at doorways to protect seam where it transitions to old floor covering. 5. Furnish and install base to match quality of existing base. Color is to be selected by the owner from standard colors.