Specifications include, but are not limited to: The Bio Chemistry Research Lab will require new construction in two phases including, but not limited to, all make safe electrical/plumbing/mechanical work, walls, ceilings, all HVAC systems and mechanical work, flooring, millwork, lab grade millwork, renovation, structural concrete, structural steel, metal panel enclosure, exterior parapet & scupper modifications, CMU masonry, grading, excavation, trenching, utilities locates, flooring, any and all structural supports required for project/equipment/vendors, painting, all in-wall blocking, rails, testing, commissioning, coordination of equipment requirements with vendors and contract documents, new accessories, fire alarm, all mechanical HVAC equipment, controls, fire protection, plumbing, N2 gas, lab gases, medical gases, system certifications, utilities, electrical, electrical connect of all equipment, all rough-in, doors, frames, hardware, card readers, stainless steel, automatic openers, equipment schedule and specifications, as shown on the drawing