Specifications include, but are not limited to: Base ERP Building #8 Upgrades: Supply and install 180 LF of chain link fence Supply and install 142 LF Deck High Wall with 6 Studs Supply and install 5,680 SF of Fire Resistant Sheetrock to Deck. Fire Taped and Finished to Level 5. Supply and install approximately 84 LF of 10 Wall. With 5/8 Sheetrock (Fire taped only no paint) Supply and install new 2x2 ceiling tile and grid in the IT Rooms Paint all drywall Supply and Install 3 Hollow Metal Fire Rated (1hr) Doors and Frames Supply and install 3 sets of Door Hardware Demolish 10 Structural Steel Columns Support the structure with temporary shoring Replace 10 Structural Steel Columns Cut, Weld and Repair 15 Structural Columns with Minor Damage Provide shop primer for all of the new steel