Specifications include, but are not limited to: Feasibility assessment and co-location recommendation oPotential benefits to the communities in terms of ability for public safety to respond in an effective, efficient, and timely manner. oAnalysis of the compatibility and compliance with Statewide Interoperability Emergency Communications guidelines; and feasibility of the relocation / reuse of CPE, radio, fire alarm systems, mapping, telephone and other related informational system equipment owned by current PSAPs and the need for new equipment at the co-located PSAP. oGather input from 9-1-1 board and other key stakeholders to determine if co-location efforts are likely to be successful. Facility location assessment. The feasibility study will focus on potential locations within the City of Newark, DE. As part of the scope, the vendor will be tasked with evaluating potential locations to include, but not limited, to the following oVeterans of Foreign War, 100 Veterans Drive, Newark, DE. 19711. oUD STAR Campus (specific site to be determined), 540 S. College Avenue, Newark, DE. 19711. oCity of Newark Municipal Building, 220 South Main Street, Newark, DE. 19711 oVacant structure (212 Murray Road; Newark, DE 19711) previously assessed for A l d e r m a n ’ s C o u r t r e l o c a t i o n . Identify additional sites that meet current operational needs, as well as future operational needs. Identify sites with the ability to remain operational under all circumstances and conditions (natural and man-made) Financial Analysis: o Provide a cost for renovation of an existing facility and for new construction. This cost estimate is for preliminary planning purposes only, it is understood that an in-depth analysis will require an architect and/or engineer independent from this study. Meeting room/classroom EOC Locker rooms Break room Offices for managers