Specifications include, but are not limited to: The work will require approximately: 120 SY Remove Pavement All Thicknesses All Types; 120 SY Subgrade Preparation; 120 SY F&I Woven Geotextile; 70 LF Remove Curb & Gutter; 70 LF F&I Curb & Gutter Standard (Type II); 70 LF F&I Edge Drain 4" Dia PVC; 120 SY F&I Class 5 Agg - 8" Thick; 75 SY Remove & Replace Driveway 6" Thick Reinf Concrete; 65 TON F&I Aggregate for Asphalt Pavement FAA 43; 830 GAL F&I Asphalt Cement PG 58-34; 120 LF Paint Epoxy Line 4" Wide; 1 LS Traffic Control - Type 1; 21,640 LB F&I DI Force Main - Fittings; 1 EA F&I Clean-out Manhole 5' Dia Reinf Cocrete; 650 LF F&I Pipe 30" Dia Fusible PVC (Sliplining); 110 LF F&I Pipe w/GB DR 25-30" Dia PVC (Open Cut); 1,050 LF F&I Pipe 30" Dia PVC (Open Cut); 1 LS Clean Abandoned 36" Pipe; 100 LF Remove Pipe All Sizes All Types; 1 LS Remove Manhole; 400 SY F&I Insulation 2" Thick; 4,000 SY Seeding Type A; 4,000 SY Mulching Type 1-Hydro; 4,000 SY Weed Control Type B; 19 EA F&I ARV and Accessories; 12,000 SF Waterproofing - Vaults & Cleanouts; 2 EA F&I Manhole Type E Reinf COnc; 1 EA Connect to Existing Structure; 3 EA Connect to Existing Pipelines; 1 EA Bypass Pumping at WSI; 50 LF Fence Removal and Replacement; 3 EA Tree Removal; and 1 LS Electrical Improvements.