Specifications include, but are not limited to: 1,300.00 CY EXCAVATION AND EMBANKMENT 1.00 LS REMOVAL OF STRUCTURES AND OBSTRUCTIONS 930.00 CY GRADED AGGREGATE BASE COURSE, TYPE B 470.00 TON BIT CONC SP TY C 160 GYRA PG 64-22 (CARB 710.00 TON BIT CONC SP TY B 160 GYRA PG 64-22 295.00 LF PVC PIPE, 6" 92.00 LF PVC PIPE, 8" 92.00 LF CORRUGATED POLY PIPE, TYPE S, 12" 2.00 EACH DRAINAGE INLET, 34" X 24" 65.00 LF 3" POLY SERVICE LINE, CLASS 160 1.00 LS INSTALL WATERLINE 95.00 LF INSTALLING SANITARY SEWER, PVC, 8" 755.00 LF TEMPORARY CONSTRUCTION FENCE 1.00 LS INITIAL EXPENSE/DE-MOBILIZATION 1.00 LS TRUCK WASH SYSTEM 1.00 LS BUILDING RENOVATION 1.00 LS NON-POTABLE WELL WITH ELECTRIC SERVICE 1.00 EACH COND JUNCT WELL,TYPE 1, 20"X20", PRECAST 1,010.00 LF FURN & INST UP TO 4" SCED 80 PVC(TRENCH) 800.00 LF FURN & INST 1-CON #10 AWG STR COP, USE-2 45.00 LF FURN & INST INS COP GW, 1/#1/0 AWG 265.00 LF FURN & INST STR INS COP GW, 1/#10 AWG 180.00 LF FURN & INST 1-CON 250 KCM STR COP, TYP 2 250.00 LF SILT FENCE 6.00 EACH INLET SEDIMENT CONTROL, DRAINAGE INLET