Specifications include, but are not limited to:The scope of work consists of Mobilization; Traffic Control and Signage; Erosion Control; Reservoir and Pump Station Site Work including: Clearing and Grubbing; Tree Removal; Topsoil Stripping and Placement; General Excavation; Compacted Backfill; 24” CMP storm sewer with FES; 18” CMP storm sewer with FES; 8” RJ DI water main; 18” RJ DI water main; 24” RJ DI water main; 4 Gate Valves with Box; 1 each Flow Meter Vault; Gravel Surfacing with Geotextile Fabric; Chain Link Fence and Gates; Street Lighting and electrical site work; Seeding and Mulching; Trees and Plants; 2 Million Gallon Raw Water Reservoir Construction including: Subgrade Preparation; Cast in Place Foundation/Base Slab and Column Supports; Precast Walls; Precast Roof and Supports; Reservoir Insulation; Reservoir Mechanical Work; Reservoir Electrical Work; Raw Water Pump Station Construction including: Subgrade Preparation, Cast in Place Foundation, Precast Walls and Roof; Pump Station Mechanical Work – Process; Industrial Coatings; Pump Station Electrical Work; Pump Station Mechanical Work – HVAC; Sundre Wellfield Work including: Afterbay Transmission Line Plug; Well C SCADA Modifications; Well A, B, D, and E Control and SCADA Modifications, Replace Well D Pump and Pitless Unit; Minot Water Treatment Plant Work including: Connection to NAWS Raw Water Main; Construction of Sundre Pressure Reducing Station including: Structural, Mechanical, and Electrical Work; Industrial Coatings; Asphalt Removal; Asphalt Patching; 30” RJ DI water main; 18” RJ DI water main; 8” RJ DI water main; 7 Gate Valves with Box; and other incidental items; Existing Raw Water Main filling, flushing, and appurtenance maintenance.