Specifications include, but are not limited to: TESTING, ADJUSTING, AND BALANCING OF AIR AND HYDRONIC SYSTEMS, MEASUREMENT OF FINAL OPERATING CONDITION OF HVAC SYSTEMS, SOUND MEASUREMENT OF EQUIPMENT OPERATING CONDITIONS The TRS facility located at 1000 Red River, Austin Texas 78701 is two multiple story buildings with a linking level connecting the east and west towers. The base bid for TRS HVAC Components Retrofit consists of a complete renovation of the hot and chilled water central plant on the fifth floor of the west building. This work includes replacement of all pumps, two water cooled chillers, two air cooled chillers, two boilers and controls upgrades from pneumatic to DDC. Existing controls are a hybrid DDC and pneumatic system. The cooling towers will remain, with minimal work required. Miscellaneous work shall include multiple return air fan replacements, motor replacements and VFD installations, controls sequencing and instrumentation upgrades, and new piping arrangements. The central plant is being converted from constant flow primary system, to a variable primary flow system. Base Bid work also includes the retrofit of 280 constant volume dual duct terminal units located in the west and east buildings with variable volume kits. All terminal unit pneumatic controls will be converted to DDC by Andover (existing HVAC control system). All on-site terminal unit work shall be completed during non-workday hours.