Specifications include, but are not limited to: A. Notify affected utility companies before starting work and comply with their requirements. B. Mark location and termination of utilities. C. Erect, and maintain temporary barriers and security devices, including warning signs and lights, and similar measures, for protection of the public, Owner, and existing improvements indicated to remain. D. Erect and maintain weatherproof closures for exterior openings. E. Erect and maintain temporary partitions to prevent spread of dust, odors, and noise to permit continued Owner occupancy. F. Prevent movement of structure provide temporary bracing and shoring required to ensure safety of existing structure. G. Provide appropriate temporary signage including signage for exit or building egress. H. Do not close or obstruct building egress path. I. Do not disable or disrupt building fire or life safety systems without 3 days prior written notice to Owner. 3.2 DEMOLITION A. Conduct demolition to minimize interference with adjacent and occupied building areas. B. Maintain protected egress from and access to adjacent existing buildings at all times. C. Do not close or obstruct roadways or sidewalks without Owners permission. D. Cease operations immediately when structure appears to be in danger and notify Architect/Engineer. E. Disconnect and remove designated utilities within demolition areas. F. Cap and identify abandoned utilities at termination points when utility is not completely removed. Annotate Record Drawings indicating location and type of service for capped utilities remaining after demolition. G. Demolish in orderly and careful manner. Protect existing improvements, supporting structural members. H. Carefully remove building components indicated to be reused.