Specifications include, but are not limited to: The demolition and renovation scope will be approximately 1,950 GSF of the existing space in the Florence Bldg “E� Level 7 for the Ophthalmology department. This space will require the demo and removal including but not limited, to existing flooring, base, walls, ceilings, ductwork, plumbing piping, lights, roofing, doors, door frames, shelving, cabinetry, fire extinguishers, all wall mounted equipment and brackets, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, coordination of demo for asbestos containing materials, electrical receptacles, lighting, switches, smoke detectors, all A/V devices and equipment, security devices and equipment, J-boxes, electrical conduit, all wiring, all switches, and telephone as shown on the drawings. The space will require new construction of walls, ceilings, MEP systems, medical gas, flooring, roofing, millwork, ceilings, painting, testing, commissioning, coordination of equipment requirements with vendors, new accessories, fire alarm, & controls, as shown on the drawings