Specifications include, but are not limited to: Professional Services will evaluate the following (but not limited to): Fire Protection System 1. DARS Administration a. Replace fire alarm system (audible, visual, panel, detectors, panel, etc) b. Spec fire sprinkler system and evaluate sprinkler installation requirement for Atrium c. Relocate Fire Department Connection (FDC) 2. DSHS Tower a. Spec fire sprinkler system and evaluate sprinkler installation requirement 3. Park 35 Buildings C & E a. Replace fire alarm system (audible, visual, panel, detectors, panel, etc) 4. Robert E. Johnson a. Replace fire alarm system (audible, visual, panel, detectors, panel, etc) 5. Thomas Jefferson Rusk a. Evaluate fire pump room 6. William P. Hobby Twr. 1,2 & 3 a. Replace fire alarm system (audible, visual, panel, detectors, panel, etc) Heating, Ventilation, Air Conditioning (HVAC) 1. Thomas Jefferson Rusk a. Replace HVAC equipment (ex. variable air volume (VAVs)) b. Replace HVAC controls Electrical Systems) 1. Brown Heatly a. Replace Automatic Transfer Switch (ATS) b. Replace flat cable with power poles and overhead distribution c. Power coordination study (includes electrical one-line, arch flash study and labeling, circuit tracing and labeling) 2. DSHS Tower a. Replace combination panels b. Power coordination study (includes electrical one-line, arch flash study and labeling, circuit tracing and labeling) 3. Park 35 Buildings a. Remove all surge protectors on branch circuit breakers b. Install main surge suppression at each building c. Add circuits to building B d. Power coordination study (includes electrical one-line, arch flash study and labeling, circuit tracing and labeling) 4. Robert E. Johnson a. Power coordination study (includes electrical one-line, arch flash study and labeling, circuit tracing and labeling) 5. Thomas Jefferson Rusk a. Replace main switch gear b. Power coordination study (includes electrical one-line, arch flash study and labeling, circuit tracing and labeling) 6. William P. Clements a. Relocate transformer b. Replace chiller starter c. Remove motor control center d. Power coordination study (includes electrical one-line, arch flash study and labeling, circuit tracing and labeling) 7. William P. Hobby Twr. 1,2 & 3 a. Add neutral to vertical riser b. Convert lighting to 277V c. Replace main switch gear d. Address water concern over the electrical equipment located in parking garage e. Power coordination study (includes electrical one-line, arch flash study and labeling, circuit tracing and labeling) Security System 1. Thomas Jefferson Rusk a. Convert to S2 including the enterprise server Elevator System 1. DSHS Tower a. Non-proprietary system b. Replace governors and controllers c. Replace key switches d. Install Variable Voltage Variable Frequency Drives (VVVFD) and motors e. Elevator cab is not included Additional Scope 1. All buildings will need to include an accessibility (ADA) report. Plans are not required. 2. Fire Protection, Electrical and Egress Systems per the State Fire Marshal Report for each building.