Specifications include, but are not limited to: THOMPSONS CREEK WWTP CONSTRUCTION INSPECTIONSERVICES. The Project consists of constructing the new Waste Water Treatment Plant, at a minimum ratedcapacity of 2 MGD, which includes all Civil, Structural, Architectural, Mechanical, HVAC,Electrical and Instrumentation work, as shown on the Drawings. The project also includesinstalling new pumps, generator and electrical building at the Jones Rd. Lift Station.Additionally, the Turkey Creek WWTP will be demolished as part of this project. The flowscurrently received by the Turkey Creek WWTP will be directed to Thompson's Creek WWTP,and a portion of the existing wastewater force main will be disinfected and converted to areclaimed water force main