Specifications include, but are not limited to: The demolition and renovation scope will be approximately 16,200 GSF of the existing space in the First Floor J Building for the Animal Research Department. This space will require the demo and removal including but not limited, to existing flooring, base, walls, ceilings, ductwork, plumbing piping, lights, doors, door frames, med gas piping, plumbing fixtures, restroom accessories, shelving, cabinetry, fire extinguishers, all wall mounted equipment and brackets, observation windows, exterior skin, walk off mats, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, chilled and hot water piping, coordination of demo for asbestos containing materials, sanitary piping, underground piping, electrical receptacles, lighting, switches, smoke detectors, all A/V devices and equipment, security devices and equipment, electrical panels, time clocks, medical gases, disconnects, electrical transformers, J-boxes, plywood paneling, electrical conduit, all wiring, all switches, and telephone as shown on the drawings. The space will require new construction of but not limited to: walls, ceilings, MEP systems, nurse call, medical gas, flooring, roofing, millwork, structural concrete walls, floors, and ceilings, structural steel, piers, painting, testing, commissioning, coordination of equipment requirements with vendors, coordination of shielding requirements with UTSMC physicist, new accessories, fire alarm, controls