Williamson Creek-Covered Bridge DR Low Water Crossing Upgrade; ADA Sidewalk and Ramp Improvements 2011 Group #11 City Wide; SAWS Pinn Road Pump Station Improvements and Meter Replacement Program 2011. Work Items include but are not limited to Temporary Traffic Lighting, Temporary Traffic Lights, Construction Staking, CMV, Coatings, Fabricated Steel & Handrails, Roofing, Doors, Windows, HVAC, Plumbing, Hauling, Water Proofing, Welding, Disinfecting, Rock Trenching (if interested in this work, please call Austin Keller 512-327-1464) Piping, Concrete, Traffic Control, Barricades, Survey, Embankments, Management, Masonry, Paving, Photography, Trucking, Fencing, Excavation, Catch Basins, Portable Toilets, Demolition, Sidewalks, Curb & Gutter, Traffic Signals, Electrical, Erosion Control, Landscaping, Fuel, and more. No additional specifications were given.