Specifications include, but are not limited to: Site work necessary to remedy non-compliant parking, ramps, and signage to currentADA and TSA standards.Fire protection sprinkler system (buildings are not currently sprinklered).New elevators (buildings do not currently have any elevators).The project is within the City of Beaumont and should comply with the 2009International Building Code.Replace all windows with 1" insulated glass system.All toilets require renovation to comply with ADA/TSA standards of 2012.Water seepage has been noted at the roofs and at the penetrations from HVACequipment. The existing roofing may need to be replaced.New Hot Water Boilers and VAV Heater system.New ADA Compliant Storefront Entrance doors.New High Voltage Electrical Transformers (4160/2400, 480/277 and 208/120 volt).New Electrical distribution power panels (480/277 and 208/120 volt).New HVAC Chillers System.Extensive landscaping of existing areas remaining and in location of demolished Building"B" Wing. The approximate areas of the buildings are as follows:- Building A - 45,000 square feet and 3 stories in height- Building B - 45,000 square feet and 3 stories in height- Building C - 30,000 square feet and 2 stories in height