GENERAL CONDITION: Comments: Lead testing 00-000GENERAL CONDITION: Comments: Safe work practices(if needed) 00-000GENERAL CONDITION: Comments: Lead clearance(if needed) 15-651MSRP CENTRAL HEATING and AIR CONDITIONING SYSTEM, COMPLETE : 115-651: Contractor to calculate the proper size of all HVAC equipment and materials. Install/Replace a Central HVAC system with a properly sized, high efficiency (14 SEER), Central heating and air conditioning unit per specifications. All permits, duct sheet & inspection form, green tag. Installation to include removal of existing system and all its components and to be replaced with new parts and equipment to. Enter tonnage of unit as units of measure No additional specifications were given.