Specifications include, but are not limited to: The demolition and renovation scope will be approximately 8283 GSF of the existing space in the Edward H. Cary Bldg. for the Pediatrics department. This space will require the demo and removal including but not limited, to existing flooring, base, walls, ceilings, ductwork, plumbing piping, lights, doors, door frames, plumbing fixtures, restroom accessories, shelving, cabinetry, fire extinguishers, all wall mounted equipment and brackets, observation windows, exterior skin, walk off mats, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, chilled and hot water piping, coordination of demo for asbestos containing materials, sanitary piping, electrical receptacles, lighting, switches, smoke detectors, all A/V devices and equipment, security devices and equipment, electrical panels, time clocks, disconnects, electrical transformers, J-boxes, plywood paneling, electrical conduit, all wiring, all switches, and telephone as shown on the drawings. The space will require new construction of walls, ceilings, MEP systems, flooring, millwork, floors, and ceilings, painting, testing, commissioning, coordination of equipment requirements with vendors, new accessories, fire alarm, controls, as shown on the drawings