Specifications include, but are not limited to: Work generally consists of the excavation and installation of a 30-feet deep 96-inch precast concrete sanitary lift station; an 8-feet by 6-feet precast valve vault; and a 12-feet by 10-feet building adjacent to the lift station on 4 helical piles to house the electrical equipment. The lift station will be equipped with two 15 HP submersible Flygt pumps, will include manhole, approximately 1,250 feet of 6-inch C900 PVC force main, a live tap of a HOBAs 36-inch forcemain, 16-inch sanitary influent pipe, 6-inch ductile iron pipe, aluminum access hatches and accessories. Ductile piping includes check valves, an air release valve, gate valves, fittings and accessories. Site work for this project includes restoration, erosion and sediment control, excavation and backfill for the structures and pipe, seeding, a non-cased bore under 58th Ave, and gravel of the service pad area.