Specifications include, but are not limited to: The Project involves construction of approximately 1.25 miles of concrete rectangular channel and includes but is not limited to, channel excavation, channel embankment, finish grading, concrete placement, storm drain installation, and drop inlet and lateral construction. Approximately one mile of the concrete lined channel consists of using colored concrete and visually enhanced form liners within the top two feet of the channel. Also included is the installation of chain link fence, post and cable fence, maintenance road construction, and installation fo trail lighting. Additionally, the project includes removal of existing structures, adjustment of sanitary sewer facilities, and protection of existing utlities.