The demolition and renovation scope will be approximately 301 GSF of the existing space in the F 3RD Floor Restrooms. This space will require the demo and removal including but not limited, to existing flooring, base, walls, ceilings, ductwork, plumbing piping, lights, , doors, door frames, plumbing fixtures, restroom accessories, shelving, cabinetry, exterior skin, walk off mats, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, piping, electrical receptacles, lighting, switches, smoke detectors, all A/V devices and equipment, security devices and equipment, electrical panels, J-boxes, plywood paneling, electrical conduit, all wiring, all switches. The space will require new construction of walls, ceilings, MEP systems, flooring, walls, floors, and ceilings, painting, electrical / lighting, new accessories, fire alarm, bathroom stalls / fixtures, controls, doors / hardware, as shown on the drawings. Contractor (GC) to furnish all of the labor, the materials, the tools, the equipment, the services and the supervision required to complete the demolition and renovation scopes of work per the Contract Documents dated September 22, 2010. No additional specifications were given.