Specifications include, but are not limited to: The City of Fargo will be accepting bids for construction of Cells 14, 16 and 17 Phase 2 and Partial Closure at the Fargo Landfill. Removal and Relocation of Stockpile 29,800CY Excavation of Soils 186,500 CY Stockpiling Clay in Landfill East of 45th St 82,600 CY Exposing of Existing Liner Tie-in 7,500C Y 3-foot Clay Cover Soil Layer 54,000 CY Topsoil Placement 54,000 SY Prepared Clay Subgrade 29,300 SY 60 Mil HDPE Liner 29,300 SY 6” HDPE Perforated Pipe 440 LF 6” HDPE Solid Pipe 275 LF 18” HDPE Solid Pipe 150 LF 12-inch Granular Protective Layer 29,300 SY Riser Vault 1 EA Leachate Pumping System 1 EA Silt Fence 3,125 LF Erosion Control Blanket 7,400 SY Drainage Swale 2,120 LF.