Specifications include, but are not limited to: Work consists of approximately 1,898 square yards of profile milling, 53 cubic yards of graded aggregate for base repairs, 143-gallons of crack sealant, 3,865 square yards of 1-inch thin-lift asphalt surface course, 10,593 square yards of recycled bituminous base course, 10,735 square yards of 2-inch bituminous asphalt surface course; 20 lineal feet of Type 2 integral curb, 274 square feet of ADA ramp sidewalk, 244 square feet of 5-foot wide sidewalk, 443 square feet of thermoplastic crosswalk, 60 lineal feet of depressed curb, 60 lineal feet of regular curb; water service improvements on McFee Street., 81 lineal feet of SDR 9 water service pipe, five (5) corporation stops, five (5) curb stops and boxes, and associated appurtenances. The work consists of the furnishing of all labor, materials, transportation, tools, supplies, and equipment necessary for a street resurfacing project (bituminous concrete overlay, excavation, removal and bituminous patching) and a water utility abandonment and reconnection project