Specifications include, but are not limited to: The contractor shall contact the following utilities in a sufficient amount of time prior to starting work. The companies will identify their facilities and it is the responsibility of the contractor and the company to coordinate their work to avoid damage to existing facilities and to allow for relocation of facilities as may be required for grading work: The following utilities were determined to be involved and were formally notified on September 14, 2016, that if their facility is located within the existing public right-of-way, any adjustment of their facility would have to be accomplished at no cost to the State, within 90 days from receipt of the notice, unless other arrangements are made with the Area Engineer. (1) Xcel Energy PO BOX 988 Sioux Falls, SD 57101 CONTACT: Bob Vankirk, TELE. #605-339-8234, The company has facilities in the area but they will not need to be relocated. A typical one call should be made and the company’s facilities should be marked (2) Santel Communications PO Box 67 Woonsocket, SD 57385 CONTACT: Ryan Thompson, TELE. #605-796-4411 The company has a few fiber lines in the vicinity of the project. The fiber lines can easily be worked around and no relocation is necessary. (3) Central Electric Coop. PO Box 850 Mitchell, SD 57301 CONTACT: Brian Bultje, TELE. #605-996-7516 The Company does not have any facilities in the project area. (4) Century Link 15 4th Ave SW. Aberdeen, SD 57401 CONTACT: Corey Moser, TELE. #605-380-8438 The Company does not have any facilities in the project area.