Specifications include, but are not limited to: A. It is the intent of the specification that the new work will provide a watertight facility. The attached specifications describe the minimum acceptable standards of construction and finish. B. SCOPE OF WORK 1. Cook Power Plant Building No. 3: Work shall include priming of existing roof membrane with asphalt primer. Adhere substrate board as specified. Fully adhere specified SBS modified base sheet, and fully adhering one ply of Thermoplastic Elvaloy® sheet. Install new miscellaneous carpentry to parapet wall as specified to provide wall flashings and new metal coping cap as specified. Raise all mechanical equipment and service lines to eight inch (8") minimum height above finished roof surface. Provide a twenty (20) year NDL manufacturer's warranty with no exclusion for up to two-inch (2") diameter hail events, and a two (2) year contractor's warranty. Work shall also include all HVAC and electrical, piping disconnect and reconnection. Installation shall be as per NRCA, SMACNA, ANSI/SPRI, specifications, details and manufacturer's guidelines. 2. Cook Power Plant Building No. 7: Work shall include priming of existing roof membrane with asphalt primer. Adhere substrate board as specified. Fully adhere specified SBS modified base sheet, and fully adhering one ply of Thermoplastic Elvaloy® sheet. Install new miscellaneous carpentry to parapet wall as specified to provide wall flashings and new metal coping cap as specified. Raise all mechanical equipment and service lines to eight inch (8") minimum height above finished roof surface. Provide a twenty (20) year NDL manufacturer's warranty with no exclusion for up to two-inch (2") diameter hail events, and a two (2) year contractor's warranty. Work shall also include all HVAC and electrical, piping disconnect and reconnection. Installation shall be as per NRCA, SMACNA, ANSI/SPRI, specifications, details and manufacturer's guidelines.