Specifications include, but are not limited to:This project will involve mold remediation and restoration work in E.E. O’Banion. The Selected Contractor is to perform all work in accordance with the attached Mold Remediation Protocol. This includes interfacing with and notifications to the Hygienist (Terra Nova). The following clarifications to the Protocol shall be considered: Room 101 is not affected. Rather, it is A101 that is affected. Any instructions within the Protocol related to room 101 should be considered to refer to room A101. TheProtocolstatesthat,“Prior t o c o m m e n c e m e n t o f m o l d r e m e d i a t i o n , a l l m o i s t u r e s o u r c e s s h a l l b e e l i m i n a t e d t o p r e v e n t f u t u r e m o l d g r o w t h . ” Elimination of moisture sources is not to be considered part of the scope of this RFP. Bidders can assume this work will be completed prior to the start of work, per the Protocol The Selected Contractor will be required to interface with SSC Utilities prior to shutting down, starting up, and initiating and removing LOTO measures on the HVAC equipment Bidders should include optional pricing for providing stand-alone electrical power (e.g. on-site generator) to supply power for equipment. Bidders should include optional pricing to replace existing carpet in each room with carpet tile (refer to Bid Documents for carpet tile specifications