Specifications include, but are not limited to:The scope of work includes all the necessary work to remove the existing piston on the elevator located at the City of Newark Municipal Building and replace the piston with a PVC liner or comparable and protectively coated cylinder. 1. The contractor will provide all labor, materials, apparatus, trucking, tools, superintendence, and services required for completion of work as described on the Specifications. 2. The contractor is responsible for obtaining all necessary permits required for the completion of this project. When obtaining Building Permits from the Planning and Development’s Code Enforcement Division, no fees will be required. 3. Design must meet all applicable codes as required by the Code Enforcement Division at time of permit application. All permits must be posted prior to the start of construction. Any additional permit fees, such as utility fees that are required for the execution of the work are the responsibility of the contractor. 4. After final inspection by the Code Enforcement Division the contractor is responsible for obtaining a Certificate of Occupancy. Certificate must be submitted to the Facilities Maintenance Superintendent before final payment will be made