PROJECT TITLE: CSU Annual Fire Sprinkler, Fire Alarm, Monitoring and Pump Inspection
BACKGROUND/PURPOSE: The contractor shall perform annual inspection on all fire sprinkler, fire alarm systems and jockey pumps at the Crow Service Unit. Sites will include Crow/Northern Cheyenne Hospital, Pryor Health Clinic and Lodge Grass Health Clinic.
SCOPE: Inspection for the Automatic Fire Protection System at the Crow Hospital, Pryor Health Clinic and Lodge Grass Health Clinic. The survey will include:
• One Annual Inspection-Survey and Fire Pump Test to include testing the antifreeze solution and appropriate valves.
• Three (3) Quarterly Inspection—Testing the Supervisory Switches and Alarms at each location.
• One complete Annual inspection of the Fire Alarm System as outlined in NFPA-72. Testing shall include fire alarm initiating devices, notification devises, fire alarm control panel functions, and any auxiliary functions that may be connected to the FACP Written documentation of the testing. Documentation shall be provided to owner.
• Ancillary Devices to be tested: Remote Annunciator, Kitchen Hood (Ansul Units), Digital Dialer (check out).
• Annual Fire Extinguisher Inspections and certification, sixty-seven (67)
• Semi-Annual Inspection and Certification of Kitchen Hood Fire Suppression System (1)
• Hand on live fire training for 354 individuals.
• Fire Sprinkler Inspection and Fire Sprinkler Pump Test for Pryor Clinic, Lodge Grass Clinic and Crow Northern Cheyenne Hospital.
• Annual back flow testing for each location (3)
• Fire Alarm Monitoring Services for 3 locations