W9123726QA012, Dry Dock for Service Barge 185 for the Louisville Repair Station. The Contractor shall furnishing all plant, labor, materials, equipment, and transportation thereof, and performing all operations required to make repairs to the vessel as specified herein. Work includes sandblasting the entire vessel exterior hull below the main deck, repairing rusted and/or damaged metal on the hull, prepping and painting the vessel hull as outlined in these specifications. In addition, work includes replacement of ceilings throughout the barge, replacing tile flooring and wall coverings, installing new lockers, removal and pressure testing of keel coolers, and inspect ballast tanks to document their condition. Please refer to the specifications below for full Performance Work Statement. Please note the solicitation, all attachments, and extended details are accessible by utilizing the below link which will take you to the PIEE system. Please pay special attention to the instructions to offerors located in the solicitation.