Base Pavements Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on airfield pavements and civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under base pavements consist of but are not limited to temporary and permanent airfield markings, install erosion control measures, seal joints, spall repair, bitumen seal coats, random crack repair, rubber removal, friction testing, remove and disposal of concrete pavements, remove, crush, and stockpile concrete pavements, asphalt cold milling and disposal of milled material, asphalt cold milling and stockpile milled material, placing, grading, and compacting government provided crushed concrete and asphalt millings, construction of new concrete pavements, groove the runway surface, install new tiedowns in new or existing pavement, placing hot mix asphalt, install subdrains, grading airfield areas to meet airfield criteria, hydroseed and or sod disturbed areas, GIS and As-Built drawings, SWPPP implementation to LRAFB and ADEQ Standards, demolition of concrete, asphalt and various structures, concrete work, Architectural Barriers Act (ABA) Ramps, handrails, and site work, site work to include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition, landscape establishment to include topsoil, trees, sodding, seeding, concrete joint sealant, asphalt maintenance to include crack sealant, and slurry seal, bollard installation, valve, meter, hydrants adjustments, AHTD Standards Roadway Construction, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, LRAFB, AHTD, and FHWA pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repair, adjustments, installation and modifications, underdrain installation, concrete steps, concrete sidewalks, and traffic detection loop installation and repair. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations.
**Amendment 1 - Amendment to posting. All questions shall be submitted no later than Friday, 15 Aug 2025 at 1:00 PM CDT. No further questions will be accepted after this date and time. Site Visit sign-in sheets are being posted only for reference and will not be a part of the contract.**
**Amendment 2 - Amendment to posting. Questions will be submitted via email to the Primary and Secondary Point of Contacts listed below. Questions and Answers will be posted in an amendment to the solicaition.**
**Amendment 3 - Amendment to Solicitation. FA446025R00020001 to include the following:
1. Update DAFFARS Provision 5352.242-9000
2. Delete DFARS Provision 252.204-7020
3. Delete FAR Provision 52.222-23
4. Revise Section L Instructions, Conditions, & Notices to Offerors or Quoters
5. Revise Attachment 1, Attachment 12, and Attachment 17
6. Add Attachment 22, Attachment 23, and Attachment 24
7. Extend proposal due date from 2 Sep 2025 to 12 Sep 2025.**
**Amendment 4 - Amendment to Solicitation. FA446025R00020002 is to incorporate the updated - Attachment 1 - Base Pavements Bid Schedule NKAK 23-1030:
FROM - Base Pavements Bid Schedule NKAK 23-1030 26 Aug 20025
TO - Base Pavements Bid Schedule NKAK 23-1030 27 Aug 20025**
**Amendment 5 - Amendment to posting. Due to the unavailability of historical weather data via the National Oceanic and Atmospheric Administration's (NOAA) website because of system upgrading, it is acceptable to use historical weather data from other websites.**
**Amendment 6 - Amendment to Solicitation. FA446025R00020003 is to add Attachment 25 - Arnold Gate Q&A 2 Sep 25 and to incorporate the updated - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25:
FROM - Attachment 22 - Arnold Gate Pavement Bid Schedule
TO - Attachment 22 - Arnold Gate Pavement Bid Schedule 2 Sep 25
Due to a contract writing system issue, an updated solicitation and SF30 will be posted at a later time. Updated solicitation and SF30 have been added.**
**Amendment 7 - Amendment to solicitation. Added 52.223-23 Sustainable Products and Services.**