This project's specification covers the replacement of 22 Fan Coil Units for the US- Embassy, Vienna.
 The work involves, but is not limited to the following:
 
 • Decommissioning cooling system
 • Draining to the required extent
 • Disconnecting cold water- and condensate pipes
 • Electrical disconnection FCU’s and room controllers
 • Removal and disposal existing FCU’s and pipes
 • Execution planning
 • Delivery and installation FCU’s incl. pipes, valves, actuators and room controllers
 • Connection cold water- and condensate pipes
 • Pipe insulation
 • Electrical connection
 • Hydraulic balancing
 • Commissioning
 • Documentation
 
Details as per Attachment A of the solicitation package.
 
 Estimated size of the project according to FAR 36.204 is between $ 25,000.00 and $ 100,000.00