9/3/2025 A spreadsheet showing results of participating vendor bids has been provided. See document "(SAM) BIDS W912DW25BA014 Rewire Power and Data Ranges"
8/22/2025 Amendment 0004- THIS AMENDMENT 1) REPLACES SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025 WITH SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_21AUG2025 AND 2) EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 26 AUG 2025 TO 2 SEPT 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 2 SEPT 2025. SEE SOLICITATION AMENDMENT - W912DW25BA0140004.
8/20/2025 Amendment 0003- THIS AMENDMENT REPLACES "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS" WITH "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)". CHANGES MADE TO "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)" ARE SHOWN IN TRACK CHANGES. THIS AMENDMENT ALSO OPENS PROJNET FOR VENDOR
QUESTIONS UNTIL 8 AM, FRIDAY 22 AUGUST 2025 (LOCAL TIME).
8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00
SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments.
8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30".
8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25".
CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.