***This is notification of an Amendment to the Solicitation. Amendment 0002. **** 8/25/2025
Amendment 0002 makes the following changes to the solicitation:
1. The FP14-Supplimental Specs are amended as shown on pages three through six of the attached amendment.
2. The response date is extended to 9/05/2025, at 12:00 noon MT.
3. The Period of Performance is changed to 10/1/2025 - 10/30/2026.
***This update extends the response date to 9/5/2025, at 12:00 pm.*** 8/19/2025
*** This is notification of an Amendment to the Solicitation. Amendment 0001. *** 8/7/2025
Amendment 0001 makes the following changes to the solicitation:
1. The SOW and FP14-Supplemental Specs are amended. See the attachment for details (0.1 1240LT25R0023 Amendment 0001).
2. Questions and Answers are posted and will be a part of any resulting award.
3. The response date is extended to 8/22/2025, at 12:00 pm MT.
SCOPE OF CONTRACT
This project will repair/reconstruct the existing sanitary sewer collection system at the Big
Smoky Administrative Site. Specific work consists of 1) removing the existing sewage
sludge from two sewage lagoons to facilitate installing new geomembrane liners for each;
2) cleaning the existing sanitary sewer collection system concrete structures to render free
of any dirt/debris, and reconditioning existing sanitary sewer manhole channels to render
smooth/uniform and reconditions/repairing existing intake/outlet structures as needed to
render structurally sound and free of defects; 3) constructing new smooth wire laydown
fence around wastewater lagoon site perimeter, including new wire gate, to prevent
unauthorized entry; 4) reconstructing the existing RV Dump Station which connects
directly to this existing collection system; 5) pulverizing the existing asphalt access
roadway to render a smooth/uniform aggregate surfacing; 6) constructing new aggregate
surfaced access roads where specified; and 7) performing all other miscellaneous
improvements as required to complete the necessary project work.
Please refer to the attached documents for the full solicitation and all supporting
documents. Also included is a checklist to ensure a complete package is submitted.