Solicitation Description This project is a Site Prep construction project to support the Sterile Processing Services (SPS) Department, located on the 2nd floor of the Durham, NC VAMC hospital. The Durham VAMC Sterile Processing Services (SPS) Department is currently equipped with cleaning, disinfecting and sterilization equipment has reached their End of Life (EOL) and has become less reliable, more susceptible to breakdowns and poor operating performance. The major control systems for some of this equipment have been obsolete and repair parts are no longer available in some cases. This equipment will be replaced, in the same locations. The construction contractor will provide professional construction services as shown in the drawings and specifications to conduct site preparation for the replacement of SPS sterilization equipment. The new equipment has already been procured by the facility, installation of equipment is not included in scope of work.