*UPDATE: See attached for REVISED SOW. The revision includes 2 additonal bathrooms. The quote due date has been extended to 6/17/2025 NLT 1300*
*4 June 2025 UPDATE - RFIs and their answers, along with photos have been added as attachments. Due date for Quotes remains 09 June 2025 NLT 1300.*
*29 May 2025 UPDATE: Including SITE MAPS**
*22 May 2025 UPDATE: FOR SITE VISTE: ALL ATTENDEES MUST HAVE A REAL ID TO GAIN ACCESS TO THE INSTALLATION*
20 May 2025 Revision(s):
-**Site Visit Time Change to 11:00AM PST** Reflected in revised RFQ.
-**Quotation Due Date Change to 9 May 2025 NLT 1300** Reflected in revised RFQ.
BUILDING LOCATION: Intersection of Arguello Road and Tuttle
Asbestos abatement and HEPA cleaning and disposal of Class II Non-Friable asbestos containing materials (ACM) found in 9” x 9” vinyl composition floor tiles with black mastic adhesive in 2,016 square feet of the first-floor interior of Bldg. 870. Lead abatement and HEPA cleaning and disposal of 2,500 square feet of lead-based, glazed green ceramic wall tiles with mastic adhesive located in the warehouse storage area and back offices of Bldg. 870. The reason we are needing this abatement to be expedited is that we have contractual obligations that is requiring us to move Amentum from their current location to building 870 by the end of September. We need to get the abatement completed ASAP in order for their to be time to complete the renovations, install furniture and complete any other necessary work.