The project includes the demolition of approximately 360 linear feet of existing floodwall and construction of approximately 360 linear feet of new floodwall. The I-wall will be replaced with a concrete inverted T-wall that goes from ground elevation (approx. 9.5 feet on average) to elevation 22.25 feet, consisting of approximately 12,800 linear feet of steel H-piles and miscellaneous earthwork. The work area is within an active chemical refinery and the contractor will be required to provide security personnel to meet MARSEC requirements. Additionally, vibration monitoring will be required. All work activities due to loading and unloading along the dock must be coordinated by contractor with INEOS. This project is located in Galveston County, Texas City, Texas