BID ABSTRACT POSTED 19-MAY-2025
_________________________________________________________________________________
AMENDMENT 0003-
THE PURPOSE OF THIS AMENDMENT IS TO: A) INCORPORATE THE GOVERNMENT'S RESPONSE TO ADDITIONAL RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED AFTER AMENDMENT 0002 WAS ISSUED; B) INCORPORATE SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS.
FOR EMPHASIS, PLEASE NOTE PARAGRAPH 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID. CHANGE IN CONTRACT SPECIALIST FROM SUNTOK MCGUINNESS TO LISA IP EMAIL: LISA.I.IP@USACE.ARMY.MIL
NOTE: BID DUE DATE REMAIN UNCHANGED (19 MAY 2025).
----------------------
**UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID:
PLEASE SEE ATTACHED.
-----------------------------------
**SPECIAL ANNOUNCEMENT: CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE. THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED. MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED.
---------
Amendment 0002 -
A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED
B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM "RICHMOND INNER HARBOR DREDGING PROJECT" TO READ "SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT"
C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION
----------------------------------------------------------------------------------------------------------------------------------------------------------------------
Amendment 0001 - Updated Pricing (Bid) Schedule
___________________________________________________________________________________________________
The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.