Tooele Army Depot (TEAD) requires a minimum of a 3 megawatt (MW) Standby Generator(s) to ensure mission readiness. These Natural Gas generators would provide the 3 MW power with controls to automatically dispatch, in conjunction with, available renewable energy resources and a future battery to complete a Microgrid. The new standby generator will provide energy resilience and security and enable the TEAD-N area to operate in an island mode, when it encounters a loss of power from the primary electric utility feed.
Disclaimer: PSC and NAICS code designations are still under consideration. PSC and NAICS codes for this Sources Sought are not considered to be final determinations. The Government reserves the right to revise as deemed appropriate if/when this requirement is distributed for procurement.