This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code. Project Labor Agreement requirements have been removed from this project via amendment 0008. Proposal due date has been extended 30 days due to this change.