** Update 01 May 2025** - Abstract of Offers has been uploaded.
This project consist of multiple Fire Prevention repairs such as flow test ramp underground hydrants, repair wet pipe sprinkle system bldg. 141, troubleshoot & repair mass notifications system bldg. 107, replace Monaco fire alarm panel bldg. 120, replace fire alarm panel bldg. 142, replace 22 carbon monoxide detection bldg. 420, replace missing heat detector bldg. 130, repair mass notification system and booster panels bldg. 407 purchase & install sprinkler escutcheons in multiple areas bldg. 421, and purchase/install missing smoke detector bldg. 421. This Project will take place in the following buildings at the 130th ANG 107, 130, 141, 142, 407, 420, and 421. Please see attached Solictation, drawings, and statement of work for additional details.