This project will dredge the Big Suamico Harbor. Both base work and all option work is to be complete in one dredge season. The base work includes dredging up to 20,000 cubic yards of material. Option work will include dredging up to an additional 20,000 cubic yards. The dredge depth in the Big Suamico Harbor is minus 8 Lower Water Datum (LWD). The dredge area will have an allowable 1.5-foot over-dredge tolerance. All the dredged material will be placed along Long Tail Point as designated by the Contracting Officer.
Please see the attached document to obtain the details of the information that's needed for the sources sought responses. Please provide your responses to Contract Specialist, Adam Haley, adam.j.haley@usace.army.mil BY the listed due date on the sam.gov site.