The Contractor shall provide non-personal services to apply knowledge, engineering expertise, and proven installation methods to comply with MIL-STD-188-125-1A Appendix A Shielding Effectiveness (SE), Appendix B Pulsed Current Injection (PCI), and Appendix C Continuous Wave Immersion (CWI) verification tests for Building 4002, approximately 174,624 square feet. Success of the testing methods shall support acceptance testing and verification testing. Evaluation of HEMP testing process must ensure that all design requirements have been satisfied for:
- Acceptance testing of installed components, units and configuration changes
- Evaluation testing to determine effectiveness of facility upgrades.
All procedures IAW DFARS 252.237-7023 apply to this DRAFT PWS.