AMENDMENT 0001
This amendment is to answer questions received (see attachment), and clarify Period Of Performance.
Period of Performance: 02/07/2025 - 06/30/2025 All work other than final generator hook up and testing needs to be done by 05/16/2025. Final generator hookup and testing needs to be accomplished within 5 business days of request of Forest Service.
THE DATE AND TIME FOR THE RESPONSES DUE HAS CHANGED TO 01/21/2025 AT 4 PM PACIFIC TIME. Period of Performance: 02/07/2025 to 06/30/2025
This project involves
Description:
The project consists of providing and installing a 600-amp transfer switch (manual or automatic) and connect to temporary power backup generator (provided by government).
Alternative: Provide and install a 400-amp transfer switch (manual or automatic) as an alternate and connect to temporary power backup generator (provided by government) if 600-amp transfer switch is unavailable or has overly long lead time.
This alternative is not in addition to, but an alternate if larger transfer switch is unavailable.
Includes all necessary materials and labor to furnish and install the transfer switch and connect to temporary power generator.
Location: Redmond Air Center Tanker Base – Tank Farm, is located at Address: 1730 SE Ochoco Way, Redmond, OR 97756
One Firm Fixed-Price (FFP} contract will be awarded. The contract period of performance will end on 05/16/2025.
The magnitude of this construction project is between $25,000.00 and $100,000.00.
Payment Bond (100% contract value) will be required of the successful awardee.
Note: Per FAR 52.204-7(b}(l), System for Award Management (SAM}, an Offeror is required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment for any contract resulting from this solicitation. Information on registration may be obtained via: https://www.sam.gov. All Offerors must complete the electronic version of the Representations and Certifications in the SAM system.