Specifications include, but are not limited to:The scope of work generally consists of the following: General Work: Construct a new lift station including 24' diameter cast in place concrete barrel to be installed by sinking, a 27'x27' precast control building, spiral stairs, painting, submersible pumps, check valves and piping, sitework, ½ mile gravel access road and miscellaneous work. Mechanical Work: Building ventilation system including intake and exhaust dampers, fans, ductwork, a cabinet ventilation system and miscellaneous work. Electrical Work: New electrical service, CT cabinet, disconnects, transfer switches, distribution panel, transformer, lighting panel, supervisory control panel, variable frequency drives, lighting, heating, telemetry and miscellaneous work. Forcemain Work: 1,700 L.F. of 12" PVC Forcemain, connection to existing 30" forcemain, new 30" forcemain valve, sewage drain down and miscellaneous work.