The Contractor shall be responsible for the mobilization of all personnel, materials, services, equipment and supplies necessary to complete the removal and installation of the Tall Chief lift station. Work includes removal of old tank and installation of a new tank, electrical components, and pumps. Contractor shall place new tank, electrical components and pumps to the specification provided. The general area shall be cleaned up by removing all materials from work site. After installation is completed, the area shall be finish graded to the desired contour to present a smooth appearance around the lift station. This lift station serves a 2-unit waterborne restroom each with a sink, toilet, and shower. Estimated peak daily flows are 600 gallons/day. The length of line from lift station to the sewage lagoon is approximately 1 mile and a vertical lift of 60 feet.